STATUS -- Payload assembly is complete. The sub payload assembly was finalized and then was mated to the rest of the payload on Saturday.

Sub Payload complete

In Andenes: The Cornell COWBOY sub payload wound and ready to integrate with the main payload structure.(Photo: Bruce Fritz)

Moving the sub payload into place

In Andenes: The sub payload gets moved into place as the finishing touch to the total payload assembly.(Photo: Bruce Fritz)

Final checks included ACS phasing tests and GPS rollout. This afternoon the truck loaded up the payload and moved it down to the motor assembly area.

Moving the payload down to the range

In Andenes: The payload is wrapped in plastic to protect it from the elements while moving it down to the motor assembly area.(Photo: Bruce Fritz)

OUTLOOK -- Tomorrow morning the payload will mate to the motor, completing the total rocket assembly. From there the rocket will go on the rail and be ready for final countdown checkouts.

Previous update -- Back to Update List -- Next update

Questions? Comments? Problems viewing the website? Please send us an email