STATUS -- The experiment teams have been on site for several days now. Most arrived on 10 Novemeber 2015 to begin payload assembly. By now the payload is fully assembled and ready for turn on checks.
In Andenes: The assembled main payload foreward section, ready for the first electrical checks.(Photo: Bruce Fritz)
In Andenes: The full payload assembly from aft to foreward section, ready to assemble.(Photo: Bruce Fritz)
In Andenes: Moving the sub-payload into place for sequence testing.(Photo: Bruce Fritz)
OUTLOOK -- After initial power on checks the payload will be ready for sequence testing, currently scheduled for Monday.